Current Position: Home>Investment Costs>Utility Costs
  • Water Supply

    Metered Water Charges: These charges are paid monthly by customers to the water supply company based on the quantity indicated on the meter. The charges are as follows:

    § Water for Industry and Business Services: 7.9 yuan per cubic meter (m3)

    § Special Water Use: 22.3 yuan per m3

    § Medium Water: 2.8-3.2 yuan per m3

    § Over-Quota Water Consumption Charges: 1-10 times the water charges for each respective category.

    Note: The aforementioned water charges include an additional 1.4 yuan per m3 for sewage treatment.

    Power Supply

    § External power supply engineering construction fee: The power supply company is responsible for the first power supply connection to the red line of the enterprise, and the enterprise pays all the power facilities and the second (multiple) power line engineering construction fee within the red line. The fee is paid by the enterprise to the power supply company at one time when the power supply contract is signed. The payment standard is the second (multiple) power supply for temporary and formal power supply of industrial projects in accordance with the actual  external power supply engineering construction costs incurred. Temporary substations used for construction are funded by the user and paid in accordance with the actual construction costs incurred.

    § Basic electricity charge: Industrial users pay the basic electricity charge of 17 yuan/kVA/month according to the load capacity specified in the power supply contract.

    § Electricity tariff: Customers are required to pay the monthly electricity tariff according to the electricity meter index, and the rates are detailed in the 'Tianjin Electricity Grid Sales Tariff'.

    Heat supply

    § Heat supply facility construction fee: In accordance with the market-oriented principle of heat supply service in Tianjin and relevant policy documents, the initial installation fee is agreed with the heat user in the heat supply network agreement.

    § Steam metering fee: Air port area: 204 RMB/ton; if the monthly steam usage of the user is less than 40% of the contracted volume usage, the user will be charged at 40% of the contracted volume usage. Part of the flow rate in excess of the application amount is settled at 2 times; Lingang area: 212 yuan/ton; the minimum flow rate is settled according to the user's steam application amount and the technical specifications of the metering meter. Part of the flow rate in excess of the applied amount is settled at 1.2 times.

    § Centralized heating fee: 1. Charges according to heating area: non-residents 40 RMB/m2/heating season. 2. Charges according to heating measurement: non-residents basic heat price is 12 RMB per m2; measuring heat price is 0.25 RMB per kWh (70 RMB per gigajou).

    Gas supply

    § Gas infrastructure construction fee: billed according to the cost budget of the design plan of the gas facilities from the opening of the municipal pipeline network to the user's equipment.

    § Gas metering fee: It is a monthly fee paid by the customer to the gas supply company according to the the meter reading. The rate is 2.62 RMB/m3.