• tjftz@adm.tjftz.gov.cn
Location:Home>Investment Environment

Air Port Economic Area

Release date:2020-05-11    
  • |
  • |
  • Energy Supporting and Price of the Free Trade AreaI.

    Water supply

    The trunk pipe is 600mm in diameter, water distribution pipe lines 300-400mm and end pipes 100mm, 150mm and 200mm on demand of the users. Circle pipe lines are adopted locally to supply water. Standardization Administration of China and the Ministry of Health have jointly issued Living Drinkable Water Sanitation Standards (GB5749-2006). The planned water supply capacity will be over 4000 m3/day, and the pressure of the most vulnerable point is not less than 0.24Mpa. Owned by the water supplier, the water supply pipelines will be expended to red line of the enterprises. All the pipelines, meter shafts, gate valves and other facilities within red lines of the enterprises shall be built and owned by the users at their own expense. The measured water fees shall be paid by the users on monthly basis to the water company according to the quantity displayed in the water meter. The following is charging standards:

    II. Water Measurement Price List

    Note: Water price includes RMB1.20/m3 of sewage treatment fees, and resident living price RMB 0.8/m3 of sewage treatment fees.

    II. Power Supply

    The Area adopts underground cable for power supply. The power lines (single circuit or underground cable) are owned by the power supplier and expended to red line of the enterprises. All the power facilities and lines for secondary or higher power source within red lines of the enterprises shall be constructed and owned by the users at their own expense.

    The following is electricity price standards of the Airport Processing Area:1. Costs of external power supply construction The power supplier will be responsible for connecting the primary power to the red lines of the enterprises. The enterprises shall pay costs for construction of all electrical facilities and secondary (multi-line) power lines. On execution of power supply contract, the costs shall be paid by the enterprises to the power supplier by a lump sum according to the following standards:

    Industrial project: The secondary (multi-line) power source for temporary and full power consumption for the industrial projects shall be paid according to costs actually incurred by external power construction. The temporary transformer substation for construction shall be built by the users at their own expenses according to the actually incurred construction costs.

    Public utilities: The secondary (multi-line) power source for temporary and full power consumption for 10KV common projects shall be paid according to the main substation capacity of the users driven by the secondary (multi-line) power source x RMB 1280/KVA. The temporary substation for construction shall be constructed by the users at their own expenses according to the actually incurred construction costs.Note: All the above charging standards include neither construction routing and compensation fees nor civil engineering fees incurred between opening and closing.

    Resident building project:

    Note: (1) When the power consumption capacity is over 100KVA by the ground-floor shops, the payment will be main transformer capacity of the user x RMB1,280/KVA. (2) The above charging standards include neither construction routing and compensation fees nor civil engineering fees. 2. Electricity fees (on monthly basis) (1) Basic electricity fees: Large industrial users shall pay basic electricity fees according to the load capacity stipulated by the contract and by the standard of RMB15/month/KVA as basic electricity fees. (2) KWH electricity fees: The users shall pay KWH electricity fees according to the figure indicated by the electricity meter according to the following standard: Bonded Logistics Area Electricity Price List Unit: RMB/KWH

    checktaskdate=&unchecktaskdate=&ssbm=&fromcontentid=&enddate=1754/1/1 0:00:00&oldnodeid=&oldnewid=&oldcontentid=&titleformatstring=False_False_False_&check_isadmin=True&check_username=admin&check_checkdate=2020/5/6 15:16:14&check_reasons=

    All Copyright Reserved by Tianjin Port Free Trade Zone Administrative Committee

    Administration Building No.166,Xi San Dao,Tianjin Port Free Trade Zone Administrative Committee,Tianjin,china 300308

    E-mail:tjftz@adm.tjftz.gov.cn